Monday, April 30, 2012

Trip 21. Gettin' Organized...

So, we've done a bunch of work over the last year and a half; we made and tore down a pyramid, we built a papercrete geodesic dome, built some prototype furniture, filled in our culvert, dug a bunch, built a berm, dug out a driveway, and learned a bunch along the way.  We've still got a lot of work to do, but here's where we're at as of 30 April, 2012:

This Means You!

Did some digging and got the berm up to level

Collecting bottles and cans to build walls with

Beer can build a wall too!

Our new "kitchen" area that will be walled in next time:

More berm wall

It may not look like it, but the dome is now a bit better organized

More bottles for the bathroom wall

Kitchen area


Nice and cozy.  At least it will be when we get more of the wall up.

Monday, April 23, 2012

#20 Seriously? Redneck thieves...

Lookin' all tactical and sh!t.

Baby Horsey!

The Gatekeeper

Building the Bathroom Wall out of Beer Bottles
Drink up!  We've got walls to build!
It'll get smoothed out as we get more done.

Landscaping the interior of the berm

And finally; Some jerks stole our cage with the Giant "NO TRESPASSING" Sign, so we had to put up hurricane fencing.  We'll get another sign.  This one will have a skull and crossbones on it. : P